Project:

34.5 Mobile Substation

Description:

To meet the mines power requirements for ongoing operations a new mobile substation was purchased and delivered in 2021. Locke’s Electrical completed the assembly of the unit.

Work included:

  • Installation of catwalks, stairs and handrails
  • Installation of gantry tower
  • Installation of new transformer, reclosers and fused cut-outs
  • Grounding
  • Electrical installation of battery banks
  • Electrical connections for the recloser control panel and NGR

Client:

IOCC

Location:

Labrador City, Labrador

  • Project Name TL 267 Foundation Installation
  • Client Locke's Electrical
  • Date 2018
  • Duration 3 months
  • Location Newfoundland