Project:

Menihek Civil Upgrades

Description:

Work at this remote site included the supply of steel grating and frame assemblies intended for installation over the stop log openings, the supply and installation of steel plating to cover gaps and tripping hazards along the spillway, and replacing temporary cable tray covers. Also included was the installation of two new rigid gates.

Description:

Work at this remote site included the supply of steel grating and frame assemblies intended for installation over the stop log openings, the supply and installation of steel plating to cover gaps and tripping hazards along the spillway, and replacing temporary cable tray covers. Also included was the installation of two new rigid gates.

Client:

Nalcor Energy

Location:

Menihek Substation, Menihek, Labrador

  • Project Name Menihek Civil Cable Trench
  • Client Locke's Electrical
  • Date 2018
  • Duration 45 days
  • Location Newfoundland