Project:
MC#1 & MC#6 Rebuild Electrical ES1 Scopes
Description:
During both the Machine 1 and Machine 6 rebuilds in the Pellet Plant, Locke’s Electrical completed the electrical contract which included:
- Onsite electrical support for interferences and temporary power
- Replacement of E300’s in the existing MCC Lineup
- Installation of new 5kV feeder cables as required
- Installation of new lighting
Client:
IOCC
Location:
Labrador City, Labrador