Project:

Hakim & Assembly Site Power Supply

Description:

In Fall of 2019 IOC moved forward with the project to install permanent power supply at both the Hakim and Assembly Sites in the Mine.

The scope of work included the following for each site:

  • Excavation, backfill and compaction for new transformer pad
  • Excavation and trenching for new power cables
  • Install of underground conduits
  • Installation of new 2 MVA transformer
  • Commissioning Support

Client:

IOCC

Location:

Labrador City, Labrador

  • Project Name TL 267 Foundation Installation
  • Client Locke's Electrical
  • Date 2018
  • Duration 3 months
  • Location Newfoundland