Project:
Shops Make-Up Air Project
Description:
Electrical was engaged in the early phases of the new make-up air project for the Shops to complete the civil works for a new Airex Unit. Later, Locke’s completed the electrical installation for the new system.
Scope of work included:
- Installation of reinforced concrete pad for the new Make Up Air Unit
- Electrical for new deduster drive and glycol pumps
- Electrical and Instrumentation for the electrical skid
- Installation and wiring of new VFD and PLC
- Installation of new garage door openers and temperature sensors
- Electrical Installation of new exhaust fans
Client:
IOCC
Location:
Labrador City, Labrador
- Project Name TL 267 Foundation Installation
- Client Locke's Electrical
- Date 2018
- Duration 3 months
- Location Newfoundland