Project:

Shops Make-Up Air Project

Description:

Electrical was engaged in the early phases of the new make-up air project for the Shops to complete the civil works for a new Airex Unit. Later, Locke’s completed the electrical installation for the new system.

Scope of work included:

  • Installation of reinforced concrete pad for the new Make Up Air Unit
  • Electrical for new deduster drive and glycol pumps
  • Electrical and Instrumentation for the electrical skid
  • Installation and wiring of new VFD and PLC
  • Installation of new garage door openers and temperature sensors
  • Electrical Installation of new exhaust fans

Client:

IOCC

Location:

Labrador City, Labrador

  • Project Name TL 267 Foundation Installation
  • Client Locke's Electrical
  • Date 2018
  • Duration 3 months
  • Location Newfoundland