Project:
Residue Storage Area (RSA) Power Line Design Build
Description:
Design, manufacture, supply, install and testing of approximately 2km of the Residue Storage Area Overhead Line Distribution at the Vale Newfoundland & Labrador Limited Nickel Processing Plant located at Long Harbour, Newfoundland and Labrador.
The Work included: ·
1) Design, Supply, Manufacture, Installation, Testing, Startup and Commissioning of a 15 kV Overhead Line Distribution.
2) Design, Supply, Manufacture, Installation, Testing, Startup and Commissioning of an Overhead Fibre Line
3) Design, Supply, Manufacture Installation, Testing, Startup and Commissioning of cable tray installed Fibre Line
4) Design, Supply, Manufacture Installation, Testing, Startup and Commissioning of Overhead Fibre Line
Client:
Vale
Location:
Long Harbour, Newfoundland
- Project Name TL 267 Foundation Installation
- Client Locke's Electrical
- Date 2018
- Duration 3 months
- Location Newfoundland